2021 Stormwater Facility Inspections
Inspections Due in 2021
2006 Agreements
All facilities with agreements from 2006 are required to have their inspections in 2021. These reports are due by August 13, 2021.
- Harmony Hills II Subdivision:
- 2006 Agreement (PDF)
- Map (PDF)
- 2021 Report - SWP25N001 (PDF): 1 wet pond
- 2021 Report - SWP25N002 (PDF): 1 wet pond
- 2021 Report - SWP25N003 (PDF): 1 wet pond
- 2021 Report - SWP25N004 (PDF): 1 dry pond
- 2021 Report - SWP25N005 (PDF): 1 wet pond
- Lilly Creek Highlands IV Subdivision:
- Lilly Creek Highlands IV Townhomes:
- 2006 Agreement (PDF)
- Map (PDF)
- 2021 Report - SWP24S006 (PDF): 1 dry pond
- 2021 Report - SWP24S007 (PDF): 1 wet pond
- 2021 Report - SWP24S012 (PDF): 1 dry pond
- Pizzeria Uno on Premier Lane: 1 dry pond with filter material
- Reich Tool and Design/AJDie-Namics: 1 wet pond and 1 dry pond
- 2006 Agreement (PDF)
- Map (PDF)
- 2021 Report - SWP28S011 (PDF)
- 2021 Report - SWP28S014 (PDF)
- Spencer's Pass East Subdivision: 1 wet pond
- Super Excavators: 1 underground system
- 2006 Agreement (PDF)
- Map (PDF)
- 2021 Report - SWP26S011 (PDF)
- Wildwood Lake: 1 wet pond
2011 Permits
All facilities with permits from 2011 are required to have their inspections in 2021. These reports are due by August 13, 2021.
- Quail Haven Subdivision: 1 wet pond
- Quail Haven Addition Number 1 Subdivision: 1 wet pond
- CVS: 6 underground storage tanks, 2 stormceptors, 2 sand filters, 1 bio-filter pond, 6 storage tanks
- 2010-05 Permit (PDF)
- Map (PDF)
- 2021 Report - SWP11S001 (PDF): 1 bio-filter
- 2021 Report - SWP11S002 (PDF): 1 bio-filter
- 2021 Report - SWP11S003 (PDF): stormceptor
- 2021 Report - SWP11S004 (PDF): stormceptor
- 2021 Report - SWP11S005-010 (PDF): 6 underground storage tanks
- 2021 Report - SWP11S011 (PDF): 1 bio-filter
- We Energies CP-26: 1 wet pond, 1 underground detention
- 2010-07 Permit (PDF)
- Map (PDF)
- 2021 Report - SWP01S006 (PDF)
- 2021 Report - SWP01S007 (PDF)
- Brook-Falls Veterinarian: 1 wet pond
- 2010-08 Permit (PDF)
- Map (PDF)
- 2021 Report - SWP35S010 (PDF)
- Breezy Hill Nursery: 1 wet pond, 1 wet Fore bay pond, 1 infiltration pond
- Willow Springs School: 1 dry pond
- Weyer Road Soccer Fields: 1 wet pond
- Wacker: 1 dry pond
- Padre Property:
- 2011-03 Permit (PDF)
- Map
- 2021 Report - SWP09S005 (PDF): 1 bio-filter pond
- Menomonee Falls Elderly Assisted Living Facility:
- 2011-03 Permit (PDF)
- Map
- 2021 Report - SWP09S006 (PDF): 1 bio-filter pond
- 2021 Report - SWP09S007 (PDF): 1 bio-filter pond
- 2021 Report - SWP09S008 (PDF): 1 bio-filter pond
- 2021 Report - SWP09S012 (PDF): 1 underground storage
- Map-Phase 1 (PDF): 4 bio-filter ponds built and 1 underground storage were built in Phase 1
- Map-Phase 2 (PDF): 3 bio-filter ponds and 1 underground storage will be built in Phase 2
- Eaton: 2 wet ponds
2016 Permits
All facilities with permits from 2016 are required to have their inspections in 2021. These reports are due by August 13, 2021.
- Community Memorial Hospital
- 2016 Permit
- Map
- 2026 Report - SWP09S002 (PDF)
- Keystone Riverview Condos
- Riverwalk on the Falls
- Fox Meadows
- 2016-03 Permit (PDF)
- Map
- 2021 Report - SWP22S002 (PDF): 1 dry pond
- 2021 Report - SWP22S003 (PDF): 1 wet pond
- 2021 Report - SWP22S004 (PDF): 1 wet pond
- 2021 Report - SWP22S005 (PDF): 1 dry pond
- 2021 Report - SWP22S006 (PDF): 1 wet pond
- 2021 Report - SWP22S007 (PDF): 1 dry pond
- 2021 Report - SWP22S008 (PDF): 1 wet pond
- 2021 Report - SWP22S009 (PDF): 1 wet pond
- Aquinas Academy
- 2016-04 Permit (PDF)
- Map
- 2021 Report - SWP22N002 (PDF)
- ER Wagner
- Tamarind Subdivision - Phase 1: 2 dry ponds and 2 wet ponds
- 2016-06 Permit (PDF)
- Map
- 2021 Report - SWP32S002 (PDF): 1 dry pond
- 2021 Report - SWP32S003 (PDF): 1 wet pond
- 2021 Report - SWP32S004 (PDF): 1 dry pond
- 2021 Report - SWP32S005 (PDF): 1 wet pond
- Home2 Suites - Transfer from VMF
- Zilber Parking Lot Lilly Road
- 2016-08 Permit (PDF)
- Map
- 2021 Report - SWP25S006 (PDF)
- Fairchild Equipment
- Shady Lane School
Biannual Inspections
Biannual Inspections due May 15 and November 15, 2021.
- Pilgrim Spring Market Place: porous pavement
- 2016-11 Permit (PDF)
- Map
- 2021 May Report - SWP26S005 (PDF)
- 2021 November Report - SWP26S005 (PDF)
- ALPS Pharmacy: porous pavement
Village Inspections on Stormwater Facilities
Due:
- Megal Ct: 1 wet pond
- TID #8 - Phase I: SW Corner Pilgrim Rd & Falls Pkwy: 1 wet pond
- Mill Pond Park Parking Lot S of Roosevelt Rd:
- Map
- 2021 Report - SWP03S009 (PDF): 1 bio-swale
- 2021 Report - SWP03S010 (PDF): 1 rain garden
- Village Park Amphitheater: 1 dry pond
- Combined Public Works Facility: 2 wet ponds
- Willowood Park: 1 wet pond
As-Builts Submitted
- Brehmer Estates: 1 wet basin
- 2019-03 Permit (PDF)
- Map
- 2021 As-Built Report - SWP33N005 (PDF)
- Ascension Hospital: 1 wet basin
- Edgewood Preserve - Phase 1: 2 wet basins
- Sanctuary at Good Hope:
- 2020-05 Permit (PDF)
- Map
- 2021 As-Built Report - SWP21N001 (PDF): 1 dry basin
- 2021 As-Built Report - SWP21N002 (PDF): 1 dry basin
- 2021 As-Built Report - SWP21N003 (PDF): 1 wet basin
- 2021 As-Built Report - SWP21N004 (PDF): 1 wet basin
- 2021 As-Built Report - SWP21N005 (PDF): 1 wet basin
- 2021 As-Built Report - SWP21N006 (PDF): 1 rain garden
- 2021 As-Built Report - SWP21N007 (PDF): 1 rain garden
- Chick-Fil-A: 1 underground facility
- 2021-01 Permit (PDF)
- Map
- 2021 As-Built Report - SWP04N024 (PDF)
- RJ Schinner:
- 2021-02 Permit (PDF)
- Map
- 2021 As-Built Report - SWP02S013 (PDF): 1 dry basin
- 2021 As-Built Report - SWP02S014 (PDF): 1 dry basin w/bio-filter
- Evergreen Fields - Phase 1: 2 wet basins
- 2021-03 Permit (PDF)
- Map
- 2021 As-Built Report - SWP32N004 (PDF)
- 2021 As-Built Report - SWP32N005 (PDF)
- Sommersfield Subdivision: 2 wet basins
- 2021-04 Permit (PDF)
- Map
- 2021 As-Built Report - SWP28S018 (PDF)
- 2021 As-Built Report - SWP28S019 (PDF)
- Edgewood Preserve Subdivision:
- 2021-05 Permit (PDF)
- Map
- 2021 As-Built Report - SWP16S002 (PDF): 1 wet pond
- 2021 As-Built Report - SWP16S003 (PDF): 1 wet pond
- 2021 As-Built Report - SWP16S004 (PDF): 1 dry basin
- 2021 As-Built Report - SWP16S005 (PDF): 1 wet pond
- 2021 As-Built Report - SWP16S006 (PDF): 1 wet pond
- Milwaukee Tool (Redline): 1 underground system
- 2021-08 Permit (PDF)
- Map
- 2021 As-Built Report - SWP13S030 (PDF)