Inspections Due in 2021
2006 Agreements
All facilities with agreements from 2006 are required to have their inspections in 2021. These reports are due by August 13, 2021.
- Harmony Hills II Subdivision:
- Lilly Creek Highlands IV Subdivision:
- Lilly Creek Highlands IV Townhomes:
- Pizzeria Uno on Premier Lane: 1 dry pond with filter material
- Reich Tool and Design/AJDie-Namics: 1 wet pond and 1 dry pond
- Spencer's Pass East Subdivision: 1 wet pond
- Super Excavators: 1 underground system
- Wildwood Lake: 1 wet pond
2011 Permits
All facilities with permits from 2011 are required to have their inspections in 2021. These reports are due by August 13, 2021.
- Quail Haven Subdivision: 1 wet pond
- Quail Haven Addition Number 1 Subdivision: 1 wet pond
- CVS: 6 underground storage tanks, 2 stormceptors, 2 sand filters, 1 bio-filter pond, 6 storage tanks
- 2010-05 Permit (PDF)
- Map (PDF)
- 2021 Report - SWP11S001 (PDF): 1 bio-filter
- 2021 Report - SWP11S002 (PDF): 1 bio-filter
- 2021 Report - SWP11S003 (PDF): stormceptor
- 2021 Report - SWP11S004 (PDF): stormceptor
- 2021 Report - SWP11S005-010 (PDF): 6 underground storage tanks
- 2021 Report - SWP11S011 (PDF): 1 bio-filter
- We Energies CP-26: 1 wet pond, 1 underground detention
- Brook-Falls Veterinarian: 1 wet pond
- Breezy Hill Nursery: 1 wet pond, 1 wet Fore bay pond, 1 infiltration pond
- Willow Springs School: 1 dry pond
- Weyer Road Soccer Fields: 1 wet pond
- Wacker: 1 dry pond
- Padre Property:
- Menomonee Falls Elderly Assisted Living Facility:
- 2011-03 Permit (PDF)
- Map
- 2021 Report - SWP09S006 (PDF): 1 bio-filter pond
- 2021 Report - SWP09S007 (PDF): 1 bio-filter pond
- 2021 Report - SWP09S008 (PDF): 1 bio-filter pond
- 2021 Report - SWP09S012 (PDF): 1 underground storage
- Map-Phase 1 (PDF): 4 bio-filter ponds built and 1 underground storage were built in Phase 1
- Map-Phase 2 (PDF): 3 bio-filter ponds and 1 underground storage will be built in Phase 2
- Eaton: 2 wet ponds
2016 Permits
All facilities with permits from 2016 are required to have their inspections in 2021. These reports are due by August 13, 2021.
- Community Memorial Hospital
- Keystone Riverview Condos
- Riverwalk on the Falls
- Fox Meadows
- Aquinas Academy
- ER Wagner
- Tamarind Subdivision - Phase 1: 2 dry ponds and 2 wet ponds
- 2016-06 Permit (PDF)
- Map
- 2021 Report - SWP32S002 (PDF): 1 dry pond
- 2021 Report - SWP32S003 (PDF): 1 wet pond
- 2021 Report - SWP32S004 (PDF): 1 dry pond
- 2021 Report - SWP32S005 (PDF): 1 wet pond
- Home2 Suites - Transfer from VMF
- Zilber Parking Lot Lilly Road
- Fairchild Equipment
- Shady Lane School
Biannual Inspections
Biannual Inspections due May 15 and November 15, 2021.
- Pilgrim Spring Market Place: porous pavement
- ALPS Pharmacy: porous pavement
Village Inspections on Stormwater Facilities
Due:
- Megal Ct: 1 wet pond
- TID #8 - Phase I: SW Corner Pilgrim Rd & Falls Pkwy: 1 wet pond
- Mill Pond Park Parking Lot S of Roosevelt Rd:
- Village Park Amphitheater: 1 dry pond
- Combined Public Works Facility: 2 wet ponds
- Willowood Park: 1 wet pond
As-Builts Submitted
- Brehmer Estates: 1 wet basin
- 2019-03 Permit (PDF)
- Map
- 2021 As-Built Report - SWP33N005 (PDF)
- Ascension Hospital: 1 wet basin
- Edgewood Preserve - Phase 1: 2 wet basins
- Sanctuary at Good Hope:
- 2020-05 Permit (PDF)
- Map
- 2021 As-Built Report - SWP21N001 (PDF): 1 dry basin
- 2021 As-Built Report - SWP21N002 (PDF): 1 dry basin
- 2021 As-Built Report - SWP21N003 (PDF): 1 wet basin
- 2021 As-Built Report - SWP21N004 (PDF): 1 wet basin
- 2021 As-Built Report - SWP21N005 (PDF): 1 wet basin
- 2021 As-Built Report - SWP21N006 (PDF): 1 rain garden
- 2021 As-Built Report - SWP21N007 (PDF): 1 rain garden
- Chick-Fil-A: 1 underground facility
- RJ Schinner:
- Evergreen Fields - Phase 1: 2 wet basins
- Sommersfield Subdivision: 2 wet basins
- Edgewood Preserve Subdivision:
- Milwaukee Tool (Redline): 1 underground system
- 2021-08 Permit (PDF)
- Map
- 2021 As-Built Report - SWP13S030 (PDF)