2018 Stormwater Facility Inspections

Inspections Due

All facilities with agreements from 2003 are required to have their inspections in 2018. These reports are due by August 15, 2018.

2008 Agreements

All facilities with agreements from 2008 are required to have their inspections in 2018. These reports are due by August 15, 2018.

2013 Permits

All facilities with permits from 2013 are required to have their inspections in 2018. These reports are due by August 15, 2018

Biannual Inspections

Biannual Inspections due May 15 and November 15, 2018

  • Pilgrim Spring Market Place: Porous Pavement SWP26s005 Permit May Report November Report


Village Stormwater Pond Inspections

Due:

  • Grand Ave Bio-Retention Pond (SWP03N009): 1 dry pond (PDF)
  • MF School District: Margaret Rd – W (SWP11N002):  1 dry pond (PDF)
  • MF School District: Margaret Rd – E (SWP11N003):  1 dry pond (PDF)
  • Deerfield Subdivision: Countryside Dr & Goldenrod Dr (SWP14N003):  1 dry pond (PDF)
  • Pheasant Hills II & III Subdivisions: Countryside Dr & Crossway Dr (SWP14N004):  1 dry pond (PDF)
  • Hunters Ridge Estates Subdivision: SW of Pilgrim Rd & Countryside Dr (SWP15N005):  1 dry pond (PDF)
  • Hunters Ridge Estates III Subdivision: NW of Pilgrim Rd & Crossway Dr (SWP15N006):  1 dry pond (PDF)
  • Mill Ridge No.5 Subdivision: NW of Lilly Rd & Manhardt Dr (SWP26N002):  1 dry pond (PDF)