Inspections Due in 2018
2003 Agreements
All facilities with agreements from 2003 are required to have their inspections in 2018. These reports are due by August 15, 2018.
- Burbach Commercial Thunder Ridge Drive: 1 dry pond
- 2003 Agreement
- Map (PDF)
- 2018 Report - SWP04N001 (PDF)
- Calvary Baptist Church: 1 wet pond
- Millcut Inc.: 1 wet pond
- PW Walsh/ Jacklin Rentals/ Super Excavators: 1 pond and 1 stormceptor
- Lilly Creek Highlands Number 2: 3 wet ponds
2008 Agreements
All facilities with agreements from 2008 are required to have their inspections in 2018. These reports are due by August 15, 2018.
- Tall Pines Subdivision: 1 wet pond
- Verona Subdivision:
- Avante Flint Drive: 1 dry pond
- Bungalows of Menomonee Falls: 1 wet pond
2013 Permits
All facilities with permits from 2013 are required to have their inspections in 2018. These reports are due by August 15, 2018
- WAC: 1 wet pond
- Scion Dental: 1 bioretention pond
- Multi-Fab: 1 wet pond
Biannual Inspections
Biannual Inspections due May 15 and November 15, 2018
- Pilgrim Spring Market Place: porous pavement
- 2016-11 Permit (PDF)
- Map
- May Report - SWP26S005 (PDF) : porous pavement
- November Report - SWP26S005 (PDF): porous pavement
Village Stormwater Pond Inspections
Due:
- Grand Ave:1 bio-retention basin
- MF School District: Margaret Rd:
- Deerfield Subdivision: Countryside Dr & Goldenrod Dr: 1 dry pond
- Pheasant Hills II & III Subdivisions: Countryside Dr & Crossway Dr: 1 dry pond
- Combined Public Works Facility (SE): Good Hope Rd: 1 wet pond
- Hunters Ridge Estates Subdivision: SW of Pilgrim Rd & Countryside Dr: 1 dry pond
- Hunters Ridge Estates III Subdivision: NW of Pilgrim Rd & Crossway Dr: 1 dry pond
- Mill Ridge No.5 Subdivision: NW of Lilly Rd & Manhardt Dr: 1 dry pond
As-Builts Submitted
- Whitestone Station: 1 wet pond
- Aero Park Subdivision
- Jade at North Hills: 1 underground detention
- Hansen Storage: 3 wet detention basins
- 2017-07 Permit (PDF)
- Map
- 2017 Asbuilt Report - SWP12N015 (PDF)
- 2017 Asbuilt Report - SWP12N016 (PDF)
- 2017 Asbuilt Report - SWP12N017 (PDF)
- Wacker-Neuson: 1 underground storage facility
- Stone Haven Condos: 1 dry basin
- 2018-06 Permit (PDF)
- Map
- 2018 As-Built Report - SWP35S008 (PDF)
- Moore Construction Services Corporate Office: 1 wet basin
- 2018-08 Permit (PDF)
- Map
- 2018 As-Built Report - SWP35S008 (PDF)
- US Foods: 2 wet ponds
- Silver Spring Estates VI: 1 wet pond 1 dry pond