2019 Stormwater Facility Inspections

Inspections Due in 2019

2004 Agreements

All facilities with agreements from 2004 are required to have their inspections in 2019. These reports are due by August 15, 2019.

2009 Permits

All facilities with Permits from 2009 are required to have their inspections in 2019. These reports are due by August 15, 2019.

2014 Permits

All facilities with permits from 2014 are required to have their inspections in 2019. These reports are due by August 15, 2019.

Biannual Inspections

Biannual Inspections due May 15 and November 15, 2019

  • Pilgrim Spring Market Place: porous pavement
    • 2016-11 Permit (PDF)
    • Map
    • May Report - SWP26S005 (PDF) : porous pavement
    • November Report - SWP26S005 (PDF): porous pavement

Village Stormwater Pond Inspections

Due:

As-Builts Submitted

  • Falls Self Storage N92 W15800 Megal Drive
  • International Autos Group: 1 underground system
  • Leonardo - DRS (Walley): 1 wet basin
    • 2019-04 Permit (PDF)
    • Map (Update)
    • 2019 As-Built Report - SWP013S28 (PDF)
  • Wittlin's Service: 1 underground system
    • 2019-05 Permit (PDF)
    • Map (Update)
    • 2019 As-Built Report - SWP04S008 (PDF)
  • JBJ Self Storage (Dale Hills): 1 dry basin
    • 2019-06 Permit (PDF)
    • Map (Update)
    • 2019 As-Built Report - SWP02N018 (PDF)
  • Alto-Shaam: 3 bio-retention ponds
  • Entrust: redesign 1 dry basin
    • 2019-08 Permit (PDF)
    • Map (Update)
    • 2019 As-Built Report - SWP26S014 (PDF)
  • Waukesha State Bank (Cave Enterprises Development, LLC): 1 wet basin
    • 2019-10 Permit (PDF)
    • Map (Update)
    • 2019 As-Built Report - SWP11S019 (PDF)