2020 Stormwater Facility Inspections
Inspections Due in 2020
2005 Agreements
All facilities with agreements from 2005 are required to have their inspections in 2020. These reports are due by August 14, 2020.
- Carters Crossing Subdivision: 3 wet ponds and 1 dry pond
- 2005 Agreement (PDF)
- Map (PDF)
- 2020 Report - SWP31N001 (PDF): 1 dry pond
- 2020 Report - SWP31N002 (PDF): 1 wet pond
- 2020 Report - SWP31N003 (PDF): 1 wet pond
- 2020 Report - SWP31N004 (PDF): 1 wet pond
- Cranes Crossing Subdivision: 2 wet Interconnected ponds
- 2005 Agreement (PDF)
- Map (PDF)
- 2020 Report - SWP33S003 (PDF) : 1 wet interconnected pond
- 2020 Report - SWP33S004 (PDF) : 1 wet interconnected pond
- Cranes Crossing Addition Number 1: 1 wet pond
- Pilgrim Glen Subdivision: 4 wet ponds
- 2005 Agreement (PDF)
- Map (PDF)
- 2020 Report - SWP23N001 (PDF): 1 wet pond
- 2020 Report - SWP23N002 (PDF): 1 wet pond
- 2020 Report - SWP23N003 (PDF): 1 wet pond
- 2020 Report - SWP23N004 (PDF): 1 wet pond
- Spec-Shep Development: 2 dry ponds near Cousins
- 2005 Agreement (PDF)
- Map (PDF)
- 2020 Report - SWP14N001 (PDF): 1 dry pond
- 2020 Report - SWP14N002 (PDF): 1 dry pond
- St. Anthony Church: 1 dry pond and 1 wet pond
- 2005 Agreement (PDF)
- Map (PDF)
- 2020 Report - SWP13S003 (PDF): 1 dry pond
- 2020 Report - SWP13S004 (PDF): 1 wet pond
- TID Number 4 Weas Development Market Place:
- 2005 Agreement (PDF)
- Map (PDF)
- 2020 Report - SWP13S005 (PDF): 1 wet pond
- 2020 Report - SWP13S006 (PDF): 1 dry pond
- 2020 Report - SWP13S007 (PDF): 1 wet pond
- 2020 Report - SWP13S008 (PDF): 1 wet pond
- 2020 Report - SWP13S016 (PDF): 1 dry pond
- 2020 Report - SWP13S017 (PDF): 1 dry pond
- Capital Heating & Cooling / Wiemer Bearing and Transmission: 1 dry pond
- Zion Church Addition: 1 wet pond
2010 Permits
All facilities with permits from 2010 are required to have their inspections in 2020. These reports are due by August 14, 2020.
- First Park Development and Quad Graphics: 1 wet pond, 1 dry pond
- 2010-01 Permit (PDF)
- Map (PDF)
- 2020 Report - SWP26S003 (PDF): 1 wet pond
- 2020 Report - SWP26S004 (PDF): 1 dry pond
- Entrust Shawn Circle: 3 dry ponds, 1 cistern
- 2010-03 Permit (PDF)
- Map (PDF)
- 2020 Report - SWP26S014 (PDF): 1 dry pond
- 2020 Report - SWP26S017 (PDF): 1 dry pond
- 2020 Report - SWP26S018 (PDF): 1 dry pond
- 2020 Report - SWP26S019 (PDF): 1 cistern
- Community Memorial Parking Lot Town Hall Road, Froedtert Offices: 1 wet pond
- Grace Lutheran Church County Line Road: 4 bio-swales, 1 wet pond, 1 swale conveyance
- 2010-06 Permit (PDF)
- Map (PDF)
- 2020 Report - SWP05N002 (PDF): 1 swale conveyance
- 2020 Report - SWP05N003 (PDF): 1 wet pond
- 2020 Report - SWP05N004 (PDF): 1 bio-swale
- 2020 Report - SWP05N005 (PDF): 1 bio-swale
- 2020 Report - SWP05N006 (PDF): 1 bio-swale
- 2020 Report - SWP05N007 (PDF): 1 bio-swale
2015 Permits
All facilities with permits from 2015 are required to have their inspections in 2020. These reports are due by August 14, 2020.
- White Stone North Pond transfer: 1 wet pond
- The Junction at White Stone Apartments: 1 wet pond
- 2015-02 Permit (PDF)
- Map
- 2020 Report - SWP03S007 (PDF): 1 wet pond
- Kwik Trip Main Street: 1 underground system
- 2015-03 Permit (PDF)
- Map
- 2020 Report - SWP02S010 (PDF): 1 underground system
- Christman Park Subdivision: 1 wet pond
- Weyerhaven Subdivision phase 2:
- 2015-05 Permit (PDF)
- Map
- 2020 Report - SWP25N012 (PDF) : 1 wet pond
- 2020 Report - SWP25N013 (PDF): 1 wet pond
- Silver Spring Estates Phase 2: 1 wet pond
Biannual Inspections
Biannual Inspections due May 15 and November 15, 2020
- Pilgrim Spring Market Place: porous pavement
- 2016-11 Permit (PDF)
- Map
- May Report - SWP26S005 (PDF) : porous pavement
- November Report - SWP26S005 (PDF): porous pavement
- ALPS Pharmacy: porous pavement
Village Stormwater Pond Inspections
Due:
- Maple Rd Wetland Scrape: Maple Rd & Christman Rd: 1 wetland scrape
- Rivers Edge Park: Parkview Dr: 1 wet pond
- Oakwood Park: Dennis Droese Dr: 1 wet pond
- Kohler Ln: 1 wet pond
- Ridgefield Subdivision Addn No.1: Sheffield Ln & Thornapple Ct: 1 wetland pond
- Ridgefield Subdivision Addn No.2: Sheffield Ln & Greenview Ave: 1 dry pond
- Ridgefield Subdivision: Greenview Ave & Lisbon Rd: 1 wetland pond
- Russell Court Pond: Russell Court: 1 wet pond
As-Builts Submitted
- Grace Commons/Capri: 3 wet ponds
- Glenroy: 1 underground detention and 1 rooftop detention
- 2019-01 Permit (PDF)
- Map
- 2021 As-Built Report - SWP03N011 (PDF)
- 2021 As-Built Report - SWP03N012 (PDF)
- Tamarack Springs: 3 wet ponds
- 2019-09 Permit (PDF)
- Map
- 2020 Report - SWP16N007 (PDF)
- 2020 Report - SWP16N011 (PDF)
- 2020 Report - SWP16N012 (PDF)
- Silver Spring Estates Phase VII: redesign 1 wet basin
- 2020-03 Permit (PDF)
- Map
- 2020 Report - SWP30N004 (PDF)
- Highlands at Aero Park: 2 wet ponds
- Milwaukee Tool (Redtag): redesign 1 wet basin
- 2020-06 Permit (PDF)
- Map
- 2020 Report - SWP13N004 (PDF)