2016 Stormwater Facility Inspections
Inspections Due
All ponds with agreements from 2006 are required to have their inspections in 2016. These reports are due by August 15, 2016.
- Harmony Hills II Subdivision: 4 wet ponds and 1 dry
- 2006 Agreement (PDF)
- Map (PDF)
- 2016 Report
- Lilly Creek Highlands IV Subdivision: 3 wet ponds and 1 dry pond
- Little League Expansion: 5 dry ponds with filter material
- 2006 Agreement (PDF)
- Map (PDF)
- 2016 Report
- Pizzeria Uno on Premier Lane: 1 dry pond with filter material
- 2006 Agreement (PDF)
- Map (PDF)
- 2016 Report
- Reich Tool and Design/AJ Die-Namics: 1 wet pond and 1 dry pond
- 2006 Agreement (PDF)
- Map (PDF)
- 2016 Report
- Spencer's Pass East Subdivision: 1 wet pond
- Super Excavators: 1 underground system
- Wildwood Lake: 1 wet pond
2011 Agreements
All ponds with permits from 2011 are required to have their inspections in 2016. These reports are due by August 15, 2016.
- We Energies CP-26: 1 wet pond, 1 underground detention
- 2011 Permit (PDF
- Map (PDF)
- Pond (PDF)
- 2016 Report (PDF)
- Underground 2016 Report
- Wacker: 1 dry pond
- Breezy Hill Nursery: 1 wet pond, 1 wet Fore bay pond, 1 infiltration pond
- Menomonee Falls Elderly Assisted Living Facility: 4 bio-filter ponds built and 1 underground storage, and 3 bio-filter ponds and 1 underground storage will be built in phase 2
- CVS:6 underground storage tanks, 2 stormceptors, 2 sand filters, 1 bio-filter pond, 1 dry temporary pond
- 2011 Permit (PDF)
- Map (PDF)
- 2016 Report
- Eaton: 2 wet ponds
- Willow Springs School: 1 dry pond
- Weyer Road Soccer Fields: 1 wet pond
- 2011 Permit (PDF)
- Map (PDF)
- 2016 Report
- Quail Haven Subdivision: 1 wet pond
- 2011 Permit (PDF)
- Map (PDF)
- 2016 Report
- Quail Haven Addition Number 1 Subdivision: 1 wet pond
- 2011 Permit (PDF)
- map (PDF)
- 2016 Report
- Brook-Falls Veterinarian: 1 wet pond
Biannual Inspections
Biannual Inspections due May 15 and November 15, 2016
- 2015 Permit (PDF)
- Pilgrim Spring Market Place: Porous Pavement May Report (PDF)
Village Inspections
Due:
- SWP15s004 Good Hope Garage
- SWP3s003 TID8 pond Pilgrim Road and Falls Parkway
As-Builts Submitted
- Christman Estates
- 2015-04 permit (PDF)
- Map 2016
- As-built Report
- 2016 as-built map
- ER Wagner
- Keystone Riverview Condos
- 2016-01 Permit (PDF)
- Map
- 2016 As-built Report
- Riverwalk on the Falls
- 2016-02 Permit (PDF)
- Map
- 2016 As-built Report
- Fox Meadows
- 2016-03 Permit
- Map
- 2016 As-built Report (PDF)
- Home2 Suites
- Zilber Parking Lot Lilly Road
- Fairchild Equipment
- Shady Lane School
- 2016-10 Permit (PDF)
- Map
- 2016 As-built Report