Inspections Due in 2016
2006 Agreements
All ponds with agreements from 2006 are required to have their inspections in 2016. These reports are due by August 15, 2016.
- Harmony Hills II Subdivision: 4 wet ponds and 1 dry
- 2006 Agreement (PDF)
- Map (PDF)
- 2016 Report - SWP25N001 (PDF): 1 wet pond
- 2016 Report - SWP25N002 (PDF): 1 wet pond
- 2016 Report - SWP25N003 (PDF): 1 wet pond
- 2016 Report - SWP25N004 (PDF): 1 dry pond
- 2016 Report - SWP25N005 (PDF): 1 wet pond
- Lilly Creek Highlands IV Subdivision: 3 wet ponds and 1 dry pond
- Little League Expansion: 5 dry ponds with filter material
- 2006 Agreement (PDF)
- Map (PDF)
- 2016 Report - SWP23S001 (PDF)
- 2016 Report - SWP23S002 (PDF)
- 2016 Report - SWP23S003 (PDF)
- 2016 Report - SWP23S004 (PDF)
- 2016 Report - SWP23S005 (PDF)
- Pizzeria Uno on Premier Lane: 1 dry pond with filter material
- Reich Tool and Design/AJ Die-Namics:
- Spencer's Pass East Subdivision: 1 wet pond
- Super Excavators: 1 underground system
- Wildwood Lake: 1 wet pond
2011 Permits
All ponds with permits from 2011 are required to have their inspections in 2016. These reports are due by August 15, 2016.
- Quail Haven Subdivision: 1 wet pond
- Quail Haven Addition Number 1 Subdivision: 1 wet pond
- CVS:6 underground storage tanks, 2 stormceptors, 2 sand filters, 1 bio-filter pond, 1 dry temporary pond
- 2010-05 Permit (PDF)
- Map (PDF)
- 2016 Report - SWP11S001 (PDF): 1 bio-filter
- 2016 Report - SWP11S002 (PDF): 1 bio-filter
- 2016 Report - SWP11S003 (PDF): stormceptor
- 2016 Report - SWP11S004 (PDF): stormceptor
- 2016 Report - SWP11S005-010 (PDF): 6 underground storage tanks
- 2016 Report - SWP11S011 (PDF): 1 bio-filter
- We Energies CP-26:
- Brook-Falls Veterinarian: 1 wet pond
- Breezy Hill Nursery: 1 wet pond, 1 wet Fore bay pond, 1 infiltration pond
- Willow Springs School: 1 dry pond
- Weyer Road Soccer Fields: 1 wet pond
- Wacker: 1 dry pond
- Menomonee Falls Elderly Assisted Living Facility: 4 bio-filter ponds built and 1 underground storage, and 3 bio-filter ponds and 1 underground storage will be built in phase 2
- Eaton: 2 wet ponds
Biannual Inspections
Biannual Inspections due May 15 and November 15, 2016
Village Stormwater Pond Inspections
Due:
- TID #8 - Phase I: SW Corner Pilgrim Rd & Falls Pkwy: 1 wet pond
- Combined Public Works Facility: 1 wet pond
As-Builts Submitted
- Christman Estates
- Keystone Riverview Condos
- Riverwalk on the Falls
- Fox Meadows
- ER Wagner
- Home2 Suites
- Zilber Parking Lot Lilly Road
- Fairchild Equipment
- Shady Lane School