2016 Stormwater Facility Inspections
Inspections Due in 2016
2006 Agreements
All ponds with agreements from 2006 are required to have their inspections in 2016. These reports are due by August 15, 2016.
- Harmony Hills II Subdivision: 4 wet ponds and 1 dry
- 2006 Agreement (PDF)
- Map (PDF)
- 2016 Report - SWP25N001 (PDF): 1 wet pond
- 2016 Report - SWP25N002 (PDF): 1 wet pond
- 2016 Report - SWP25N003 (PDF): 1 wet pond
- 2016 Report - SWP25N004 (PDF): 1 dry pond
- 2016 Report - SWP25N005 (PDF): 1 wet pond
- Lilly Creek Highlands IV Subdivision: 3 wet ponds and 1 dry pond
- 2006 Agreement (PDF)
- Map (PDF)
- 2016 Report - SWP24S005 (PDF): 1 wet pond
- 2016 Report - SWP24S006 (PDF): 1 dry pond
- 2016 Report - SWP24S007 (PDF): 1 wet pond
- 2026 Report - SWP24S012 (PDF): 1 dry pond
- Little League Expansion: 5 dry ponds with filter material
- 2006 Agreement (PDF)
- Map (PDF)
- 2016 Report - SWP23S001 (PDF)
- 2016 Report - SWP23S002 (PDF)
- 2016 Report - SWP23S003 (PDF)
- 2016 Report - SWP23S004 (PDF)
- 2016 Report - SWP23S005 (PDF)
- Pizzeria Uno on Premier Lane: 1 dry pond with filter material
- 2006 Agreement (PDF)
- Map (PDF)
- 2016 Report - SWP04N007 (PDF)
- Reich Tool and Design/AJ Die-Namics:
- 2006 Agreement (PDF)
- Map (PDF)
- 2016 Report - SWP28S011 (PDF): 1 wet pond
- 2016 Report - SWP28S014 (PDF): 1 dry pond
- Spencer's Pass East Subdivision: 1 wet pond
- Super Excavators: 1 underground system
- Wildwood Lake: 1 wet pond
2011 Permits
All ponds with permits from 2011 are required to have their inspections in 2016. These reports are due by August 15, 2016.
- Quail Haven Subdivision: 1 wet pond
- 2010-02 Permit (PDF)
- Map (PDF)
- 2016 Report - SWP33N004 (PDF)
- Quail Haven Addition Number 1 Subdivision: 1 wet pond
- 2010-02 Permit (PDF)
- Map (PDF)
- 2016 Report - SWP33N003 (PDF)
- CVS:6 underground storage tanks, 2 stormceptors, 2 sand filters, 1 bio-filter pond, 1 dry temporary pond
- 2010-05 Permit (PDF)
- Map (PDF)
- 2016 Report - SWP11S001 (PDF): 1 bio-filter
- 2016 Report - SWP11S002 (PDF): 1 bio-filter
- 2016 Report - SWP11S003 (PDF): stormceptor
- 2016 Report - SWP11S004 (PDF): stormceptor
- 2016 Report - SWP11S005-010 (PDF): 6 underground storage tanks
- 2016 Report - SWP11S011 (PDF): 1 bio-filter
- We Energies CP-26:
- 2010-07 Permit (PDF)
- Map (PDF)
- 2016 Report - SWP01S006 (PDF): 1 dry pond
- 2016 Report - SWP01S007 (PDF): 1 underground detention
- Brook-Falls Veterinarian: 1 wet pond
- Breezy Hill Nursery: 1 wet pond, 1 wet Fore bay pond, 1 infiltration pond
- 2010-09 Permit (PDF)
- Map (PDF)
- 2016 Report - SWP06N002 (PDF): 1 wet pond
- 2016 Report - SWP06N003 (PDF): 1 wet fore bay pond
- 2016 Report - SWP06N004 (PDF): 1 infiltration pond
- Willow Springs School: 1 dry pond
- Weyer Road Soccer Fields: 1 wet pond
- 2011-01 Permit (PDF)
- Map (PDF)
- 2016 Report - SWP31S001 (PDF)
- Wacker: 1 dry pond
- Menomonee Falls Elderly Assisted Living Facility: 4 bio-filter ponds built and 1 underground storage, and 3 bio-filter ponds and 1 underground storage will be built in phase 2
- 2011-03 Permit (PDF)
- Map (PDF):
- 2016 Report - SWP09S005 (PDF): 1 bio-filter pond
- 2016 Report - SWP09S006 (PDF): 1 bio-filter pond
- 2016 Report - SWP09S007 (PDF): 1 bio-filter pond
- 2016 Report - SWP09S008 (PDF): 1 bio-filter pond
- 2016 Report - SWP09S012 (PDF): 1 underground storage
- Map-Phase 1 (PDF): 4 bio-filter ponds built and 1 underground storage were built in Phase 1
- Map-Phase 2 (PDF): 3 bio-filter ponds and 1 underground storage will be built in Phase 2
- Eaton: 2 wet ponds
Biannual Inspections
Biannual Inspections due May 15 and November 15, 2016
- 2015-07 Permit (PDF)
- Map
- Pilgrim Spring Market Place: Porous Pavement
- 2016 May Report - SWP26S005 (PDF)
- 2016 November Report - SWP26S005 (PDF)
Village Stormwater Pond Inspections
Due:
- TID #8 - Phase I: SW Corner Pilgrim Rd & Falls Pkwy: 1 wet pond
- Combined Public Works Facility: 1 wet pond
As-Builts Submitted
- Christman Estates
- 2015-04 permit (PDF)
- Map
- 2016 As-Built Report - SWP04S006 (PDF)
- Keystone Riverview Condos
- 2016-01 Permit (PDF)
- Map
- 2016 As-built Report - SWP13N001 (PDF)
- Riverwalk on the Falls
- Fox Meadows
- ER Wagner
- Home2 Suites
- Zilber Parking Lot Lilly Road
- Fairchild Equipment
- Shady Lane School
- 2016-10 Permit (PDF)
- Map
- 2016 As-built Report - SWP04S007 (PDF)