2013 Stormwater Facilities Inspections

Inspections Due

All ponds with agreements from 2003 are required to have their inspections in 2013. These reports are due by August 15, 2013.

2008 Agreements

All ponds with agreements from 2008 are required to have their inspections in 2013. These reports are due by August 15, 2013.

Quarterly Inspections due March 31, June 30, September 30, December 31, 2013

Village Stormwater Pond Inspections 

  • MF School District: Margaret Rd – W (SWP11N002):  1 dry pond (PDF)
  • MF School District: Margaret Rd – E (SWP11N003):  1 dry pond (PDF)
  • Deerfield Subdivision: Countryside Dr & Goldenrod Dr (SWP14N003):  1 dry pond (PDF)
  • Pheasant Hills II & III Subdivisions: Countryside Dr & Crossway Dr (SWP14N004):  1 dry pond (PDF)
  • Hunters Ridge Estates Subdivision: SW of Pilgrim Rd & Countryside Dr (SWP15N005):  1 dry pond (PDF)
  • Hunters Ridge Estates III Subdivision: NW of Pilgrim Rd & Crossway Dr (SWP15N006):  1 dry pond (PDF)
  • Mill Ridge No.5 Subdivision: NW of Lilly Rd & Manhardt Dr (SWP26N002):  1 dry pond (PDF)

As-Builts Submitted

2013 As-builts