Asphalt Paving ProgramProject # 41259-3 Time Frame
Summer 2025 Completed Project Overview The Village asphalt paving program replaces asphalt pavement that has deteriorated to such a level that routine maintenance and road sealing is no longer effective. The asphalt paving program consists of removing and replacing the top 2 to 4 inches of asphalt from the road. Providing new pavement aids in extending the serviceable life of the roadway, which leads to overall cost savings by reducing the need for costly roadway reconstruction. Asphalt Paving Location Map (PDF) |  |
Campbell DrProject # 41249 (DOT# 2720-09-01/71) Time Frame Design - 2025 Construction - 2026 Project Overview Remove and replace existing bridge |  |
Crack Cleaning & SealingProject # 41259-2 Time Frame
Summer 2025 Completed Project Overview The crack cleaning and sealing program removes loose material from cracks and applies a layer of flexible tar to extend the life of roads with minimal traffic interruption. Crack Cleaning & Sealing Map (PDF)
|  |
Curb, Gutter & Driveway ProgramProject # 41257 Time Frame
Summer 2025 Completed Project Overview The village has a program to replace sections of concrete curb and gutter that have been determined to be defective by the Village. The defective sections of curb and gutter usually have settled and exhibit poor drainage and ponding water, which will percolate into the roadway sub-grade resulting in premature deterioration of the roadway pavement and costlier repairs. If a defective section of curb and gutter is located through a driveway opening, the Village will evaluate the property owners driveway approach and determine if the approach should be replaced. The property owner has the option to have the approach replaced under the program at the owner’s expense. Curb & Gutter Location Map (PDF) |  |
Elmwood DrProject # 72099 Time Frame
Summer 2025 Completed Project Overview
|  |
Grand AveProject # 41243 Time Frame
Summer 2025 Completed Project Overview- Water Main
- Storm Sewer & Street Reconstruction
|  |
Lannon RdProject # 72100 Time Frame Summer 2025 Project Overview- Fiber Optic Communication Extension
- Directional Bore Conduit (out of traffic)
|  |
MacArthur DrProject # 72098 Time Frame
Fall 2025 Completed Project Overview | |
Menomonee AveProject #
72088 & 41238 Time FrameProject Overview |  |
Menomonee Ave CulvertProject # 74023 Time Frame Summer 2026 Project Overview Remove and replace existing culvert |  |
Overview DrProject # 41248 Time Frame
Summer 2025 Completed Project Overview Remove and replace existing bridge | |
Pedestrian BridgesProject # 64080 Time Frame
October-November 2025 Completed Project Overview Remove and replace existing pedestrian bridges in Lime Kiln Park & Rotary Park |  |  |
Seal Coat & Flex Patching ProgramProject # 41259-1 Time Frame
Fall 2025 Completed Project Overview The sealcoating program applies a layer of specially formulated oils and paving material to form a protective barrier from sun, water, and salt. The flex patching program repairs larger cracks with a flexible aggregate and tar mix without requiring full surface replacement. These extend the life of roads and improve the riding surface with minimum traffic interruption. Seal Coat & Flex Patching Map |  |
Sidewalk Replacement ProgramProject # 41256 Time Frame
Summer 2025 Completed Project Overview The village has a program to replace sections of concrete sidewalk that have been determined to be defective. The defective sections of sidewalk exhibit poor drainage, joint separation, cracking, spalling, and settlement of 3/4 inches or more. If the section of sidewalk through the driveway opening is deemed defective, the village will evaluate the driveway approach and determine if the approach should be replaced. Qualifying ¾” trip hazards will be shaved. Removal and replacement of identified defective sidewalks in the project area will be addressed. Sidewalk Replacement Map |  |
Storm SewerProject # 41258
Time Frame
Summer 2025 Completed
Project Overview |  |
Theodore AveProject # 72085 Time Frame
Summer 2025 Completed Project Overview- Water main
- Sanitary laterals
|  |