Public Projects

Aero Park Phase 1

Project #
64075

Time Frame
Summer 2022 Completed

Project Overview
  • Grading
  • Prairie/Wetland restoration
  • Trails
  • Boardwalk
Future phases include landscaping, parking, playground, shelter, stormwater, basketball court, tennis/pickleball courts, restrooms.
Aero Park Plan

Asphalt Paving Program

Project #
41236

Time Frame
Summer 2022 Completed

Project Overview
The Village asphalt paving program replaces asphalt pavement that has deteriorated to such a level that routine maintenance and road sealing is no longer effective. The asphalt paving program consists of removing and replacing the top 2 to 4 inches of asphalt from the road.

Providing new pavement aids in extending the serviceable life of the roadway, which leads to overall cost savings by reducing the need for costly roadway reconstruction.

Asphalt Paving Location Map (PDF)

Paved Street

Chippewa Dr

Project #
41232

Time Frame
Summer 2022 Completed

Project Overview

  • Water main
  • Storm sewer
  • Street reconstruction
CHIPPEWA_DR

Curb, Gutter & Driveway Program

Project #
41234

Time Frame
Summer 2022 Completed

Project Overview
The Village has a program to replace sections of concrete curb and gutter that have been determined to be defective by the Village. The defective sections of curb and gutter usually have settled and exhibit poor drainage and ponding water, which will percolate into the roadway sub-grade resulting in premature deterioration of the roadway pavement and costlier repairs.

If a defective section of curb and gutter is located through a driveway opening, the Village will evaluate the property owners driveway approach and determine if the approach should be replaced. The property owner has the option to have the approach replaced under the program at the owner’s expense.

Curb & Gutter Location Map (PDF)

Curb and Gutter Under Construction

Jacobson Dr

Project #
41224

Time Frame
Summer 2022 Completed

Project Overview
  • Storm sewer
  • Street reconstruction
JACOBSON_2022

Laurel Ln / Grand Ave

Project #
72078

Time Frame
Summer 2022 Completed

Project Overview
  • Water main
LAUREL_LN

Lilly Rd Bridge

Project #
41216

Time Frame
Summer 2022 Completed

Project Overview
The Village of Menomonee Falls, in cooperation with the Wisconsin Department of Transportation and the Federal Highway Administration, is evaluating alternatives for the replacement of the Lilly Road Bridge over the Menomonee River.

The existing Lilly Road Bridge was built in 1937 and bridge maintenance work took place in 2011. The existing bridge is structurally deficient and lacks pedestrian and bicycle accommodations, and has reached the end of its useful life. Rehabilitation would be a short-term solution and only address motorized vehicle needs.  Bridge replacement, on the other hand, would provide pedestrian and bicycle accommodations and have a longer structure life.

The proposed bridge is a single-span prestressed concrete girder structure. It will closely follow the existing horizontal and vertical alignment of Lilly Road. There will be 1-12’ northbound travel lane and 1-12’ southbound travel lane. Adjacent to the travel lanes on the bridge will be 5’ shoulders and 6.5’ raised sidewalks. To further improve pedestrian access, a crosswalk, with ADA compliant curb ramps, is proposed on the north side of the Lilly Road and Menomonee Avenue intersection.

Lilly Rd Bridge Project Information
LILLY_RD_BRIDGEThe bridge will be closed June 6th through the end of September.

St Francis Dr

Project #
72075

Time Frame
Summer 2022 Completed

Project Overview
  • Water main
ST_FRANCIS_DR

Sidewalk Replacement Program

Project #
41233

Time Frame
Summer 2022 Completed

Project Overview
The village has a program to replace sections of concrete sidewalk that have been determined to be defective. The defective sections of sidewalk exhibit poor drainage, joint separation, cracking, spalling, and settlement of 3/4 inches or more.

If the section of sidewalk through the driveway opening is deemed defective, the village will evaluate the driveway approach and determine if the approach should be replaced.

Qualifying ¾” trip hazards will be shaved. Removal and replacement of identified defective sidewalks in the project area will be addressed.

Sidewalk Replacement Map (PDF)

Sidewalk

Stonefield Rd

Project #
72067

Time Frame
Summer 2022 Completed

Project Overview

  • Water main
STONEFIELD_RD

Town Line Rd Booster Station & Reservoir

Project #
72054

Time Frame
Summer/Fall 2022

Project Overview
  • Water booster station
  • Water reservoir
TOWN_LINE_RD_BOOSTER

Village Park Phase 2

Project #
64074

Time Frame
Summer/Fall 2022 Completed

Project Overview
The Village of Menomonee Falls has approved a contract for construction of a second phase of improvements at Village Park in 2022. The centerpiece of the Phase II project is a 12,000+ square foot accessible play area.  This project also includes a splash pad, pickleball and tennis courts, shaded seating areas, a new parking lot, trail improvements, and a reservable picnic shelter. These improvements build on the 2020 redevelopment of the eastern end of the park which added an amphitheater, multi-purpose plaza, and great lawn. The project supports the goal of the Comprehensive Outdoor Recreation Plan for Village Park to become a destination park and event space.

The play area and splash feature are expected to be among the most utilized features in the Village's park system. This project is supported by a $1 million fundraising campaign being led by the Optimist Club of Menomonee Falls. Construction on the Phase II is expected to begin this spring and continue through the fall.

View Village Park Project Details

Village Park Phase II Plan