Current Development Projects

JAX Incorporated

Construction is underway on a 130,899 square foot building with office, warehouse, production, and receiving areas to be located on Manhardt Drive in southeast Menomonee Falls. The two story office area will contain 31,000 square feet, and the facility will employ 33 full-time employees when complete. The approved site plan includes areas reserved for possible future additions. The JAX Incorporated facility will occupy the last remaining vacant parcel on Manhardt Drive. 
JAX Incorporated April 2023

Tailored Label Products

Construction is moving forward on a 82,000 square foot corporate headquarters and manufacturing facility for Tailored Label Products Inc. on the southwest corner of the intersection of Good Hope Road and 124th Street in eastern Menomonee Falls. The approved plans include space for a 39,400 square foot future addition on the south side of the facility. 
Tailored Label Products April 2023

Marian Milwaukee

Construction is proceeding on a 17,857 square foot addition connecting two existing Marian Milwaukee buildings on Brahm Court in southeastern Menomonee Falls. The addition will expand Marian Milwaukee's capacity for flexible components production. When complete, the combined building area of the facility will be nearly 70,000 square feet.
Marian Milwaukee November 2022 Image

Riverwalk II Apartments

Construction is underway on a mixed use building to include a ground level retail space and 45 apartment units at the southeast corner of the intersection of Main Street and Church Street in downtown Menomonee Falls. The project design uses a “stepped back” approach for the upper level apartments to accommodate the scale of nearby buildings, and the approved project will include three levels of interior parking to accommodate residents and visitors.
Riverwalk Phase II Rendering

Nelson Brothers Power Center

Construction is moving forward on a 4,000 square foot addition to the Nelson Brothers power equipment store located near the intersection of Lisbon Road and Marcy Road in southern Menomonee Falls. The project will expand the retail and storage space for this long-standing local business. 
Nelson Brothers Power Center in April 2023

Springhill Suites by Marriott Hotel

Construction is proceeding on a four story 103 room hotel on the west side of Falls Parkway across from the existing Home 2 Suites hotel in the Whitestone Station mixed use development area. The 65,065 square foot hotel will have an indoor pool, fitness center, and an outdoor patio. 
Springhill Suites by Marriott April 2023

Duet Apartments

Plans have been approved for two multi-family buildings with a combined total of 86 units on east Main Street adjacent to Emery's Cycling, Triathlon & Fitness. There will be 36 units in the western building and 50 units in the eastern building. A combination of surface and enclosed parking will be provided for residents. Construction is currently underway on the 36 unit western building. 
Duet Apartments Site Plan Opens in new window

Tamarack Springs

Construction is nearly complete on a 170 unit apartment development located at the southeast corner of the intersection of Town Hall Road and Custer Lane near Froedtert Menomonee Falls Hospital. The "Condo Style" apartment buildings in the approved plans range from four to ten units and the project includes a 4,800 square foot community center with a pool, fitness center, and other amenities. 


Tamarack Springs Apartments in April 2023

Highlands at Aeropark

The Village has approved plans for a 224 unit senior apartment building and 32 senior town homes (in four 8 unit buildings) located on the north side of Lisbon Road to the east of Tamarind Way in southwest Menomonee Falls. A Final Plat was approved in 2020 for 17 single family homes along the west side of the site. The senior town homes have been completed and construction on the apartment building is now underway. 


HIghlands at Aero Park Site Plan Low Resolution

High Bluff at Creekwood Crossings

Construction is proceeding on a 120 unit apartment development located at the southeast corner of the intersection of Marcy Road and Silver Spring Drive in southern Menomonee Falls. The buildings in the approved plan have six units each. Each unit in the development will have a private entrance, a private garage stall, and private parking space. 

Creekwood Residences Site Plan

Evergreen Fields Phase II

The Village approved a Final Plat for 22 single family lots to be developed along the south side of Silver Spring Drive between Lannon Road and One Mile Road in southwest Menomonee Falls. These lots range in size from 9,250 square feet to 15,340 square feet with an average size of 11,404 square feet. This phase is part of an overall subdivision concept that includes 109 single family lots and 58 duplex condominiums.  


Evergreen Fields Phase II

Pilgrims Landing

Plans for 26 duplex condominiums and one single family home have been approved for a site on the west side of Pilgrim Road south of Good Hope Road in central Menomonee Falls. Construction on the new living units began in 2021.
Pilgrims Landing Site Plan

Sommersfield Subdivision 

A Final Plat was approved in 2022 for a subdivision with 29 lots located on lands north of Silver Spring Drive and east of Clover Lane in southern Menomonee Falls. Lot sizes in the subdivision range from 10,800 square feet to 14,256 square feet with an average lot size of 12,120 square feet. 


Sommersfield Final Plat

Sanctuary at Good Hope

The Village approved a Final Plat in 2021 for 25 single family lots in a conservation development style subdivision located on the southwest corner of Good Hope Road and Town Hall Road. The Sanctuary at Good Hope includes lots ranging in size from 1.02 acres to 11.16 acres with the average lot containing 1.65 acres. 


Sanctuary at Good Hope Final Plat

Edgewood Preserve Addition No. 1

This subdivision with 38 single family lots is under construction on the east side of Town Hall Road to the north of Good Hope Road in central Menomonee Falls. Edgewood Preserve Addition No. 1 includes lots ranging in size from 15,040 square feet to 29,131 square feet with an average lot containing 17,808 square feet. This subdivision is located immediately to the north of the six lot Edgewood Preserve conservation development subdivision which was approved in 2020. 

Edgewood Preserve Addition No. 1 Final Plat

Glen at Wanaki Subdivision

The Village approved (two) Final Plats in 2022 for a total of 53 single family lots in a subdivision located on lands south of Lisbon Road and south of Wanaki Golf Course in southwestern Menomonee Falls. This planned residential development is being marketed with maintenance, lawn mowing, snow removal, and landscaping services provided. The project is being developed in two phases to provide an extended window for project completion. Lot sizes in the Glen at Wanaki range from 10,124 square feet to 33,074 square feet. 

The Glen at Wanaki Phase II Final Plat

Sandhill Meadow Subdivision

A Preliminary Plat was approved in 2022 for a subdivision with 50 lots located on lands near the southwest corner of the intersection of Silver Spring Drive and One Mile Road in southern Menomonee Falls. As proposed, lot sizes in this subdivision range from 10,033 square feet to 24,619 square feet with an average size of 12,805 square feet. Site grading and preparation are now underway for this development. 


Sandhill Meadow Preliminary Plat