2015 Stormwater Facilities Inspections

Inspections Due

All ponds with agreements from 2005 are required to have their inspections in 2015. These reports are due by August 15, 2015. 

 

 
All ponds with agreements from 2010 are required to have their inspections in 2015. These reports are due by August 15, 2015. 
    
       

Quarterly Inspections due March 31, June 30, September 30, November 15, 2015
          2015 Permit            
          Pilgrim Spring Market Place: Porous Pavement
 

 Village Stormwater Ponds Inspections Due:

  • Oakwood Park: 1 wet pond 
  • Ridgefield Subdivision: 2 wet ponds and 1 dry pond 
  • Stopher TID: 1 wet pond
  • Christman and Maple Rd:  1 wetland scrape
  • Fire Station #1: 1 wet pond
  • Kohler Lane: 1 dry pond
  • Russel Court Pond: 1 wet pond

 As-Builts Submitted
 2015 As-builts