2013 Stormwater Facilities Inspections

Inspections Due
All ponds with agreements from 2003 are required to have their inspections in 2013.  These reports are due by August 15, 2013. 

   
All ponds with agreements from 2008 are required to have their inspections in 2013.  These reports are due by August 15, 2013. 
     
Quarterly Inspections due March 31, June 30, September 30, December 31, 2013  
Village Stormwater Pond Inspections due:
  • Hunter's Ridge Estates at Pilgrim & Countryside: 1 dry pond
  • Hunter's Ridge Estates III at Pilgrim & Crossway: 1 dry pond
  • Mill Ridge #5 on Lilly Rd between Mill Rd and Bobolink Ave.: 1 dry pond
  • Pheasant Hills II & III on Crossway & Meadowlark: 1 dry pond
  • Deerfield Subdivision on Countryside Drive: 1 dry pond
  • MF School District on Margaret Ave. East:  1 dry pond
  • MF School District on Margaret Ave. West:  1 dry pond
As-Builts Submitted
2013 As-builts