2018 Stormwater Facility Inspections

Inspections Due
All facilities with agreements from 2003 are required to have their inspections in 2018.  These reports are due by August 15, 2018. 

 
  • Burbach Commercial Thunder Ridge Dr.: 1 dry pond 
    • 2003 Agreement and map       2018 Report
  • Calvary Baptist Church: 1 wet pond
  • Millcut Inc.: 1 wet pond 
  • PW Walsh/ Jacklin Rentals/ Super Excavators: 1 pond and 1 stormceptor 
  • Lilly Creek Highlands #2: 3 wet ponds
 
All facilities with agreements from 2008 are required to have their inspections in 2018.  These reports are due by August 15, 2018. 
      
All facilities with permits from 2013 are required to have their inspections in 2018.  These reports are due by August 15, 2018
 
 Biannual Inspections due May 15 and November 15, 2018
  • Pilgrim Spring Market Place: Porous Pavement SWP26s005   Permit     May Report    November Report
 
Village Stormwater Pond Inspections due:
  • Hunter's Ridge Estates at Pilgrim & Countryside: 1 dry pond
  • Hunter's Ridge Estates III at Pilgrim & Crossway: 1 dry pond
  • Mill Ridge #5 on Lilly Rd between Mill Rd and Bobolink Ave.: 1 dry pond
  • Pheasant Hills II & III on Crossway & Meadowlark: 1 dry pond
  • Deerfield Subdivision on Countryside Drive: 1 dry pond
  • MF School District on Margaret Ave. East:  1 dry pond
  • MF School District on Margaret Ave. West:  1 dry pond

As-Builts Submitted


2018 As-builts