2018 Stormwater Facility Inspections

Inspections Due

All facilities with agreements from 2003 are required to have their inspections in 2018. These reports are due by August 15, 2018.

2008 Agreements

All facilities with agreements from 2008 are required to have their inspections in 2018. These reports are due by August 15, 2018.

2013 Permits

All facilities with permits from 2013 are required to have their inspections in 2018. These reports are due by August 15, 2018

Biannual Inspections

Biannual Inspections due May 15 and November 15, 2018

  • Pilgrim Spring Market Place: Porous Pavement SWP26s005 Permit May Report November Report


Village Stormwater Pond Inspections

Due:

  • Hunter's Ridge Estates at Pilgrim and Countryside: 1 dry pond
  • Hunter's Ridge Estates III at Pilgrim and Crossway: 1 dry pond
  • Mill Ridge Number 5 on Lilly Road between Mill Road and Bobolink Avenue: 1 dry pond
  • Pheasant Hills II and III on Crossway and Meadowlark: 1 dry pond
  • Deerfield Subdivision on Countryside Drive: 1 dry pond
  • MF School District on Margaret Avenue East: 1 dry pond
  • MF School District on Margaret Avenue West: 1 dry pond