Current Development Projects

White Stone Station


White Stone Station is a mixed-use development located along Falls Parkway, north of Roosevelt Drive. The development is anchored by Costco Wholesale and will include 318 apartments, multiple commercial retail buildings and a mix of restaurants. Froedtert Health and the Wisconsin Athletic Club were constructed on the far east side of the development in 2013.

Riverwalk on the Falls


Wimmer Communities is constructing a 114-unit apartment building on the former Associated Bank property located adjacent to Mill Pond on Main Street in the Village Centre. The development incorporates an approximately 2,000 square-foot commercial space near Main Street adjacent to the dam. 
The redevelopment of this parcel will eliminate a functionally obsolete structure in the heart of downtown while adding much needed density which will contribute to a thriving downtown.
White Stone Station Dev 2.jpg
wimmer front rear.JPG

Fresh Thyme Farmers Market


The southern portion of Colonial Plaza is being reconstructed as a 29,050 square-foot Fresh Thyme Farmers Market, a grocer that focuses on fresh and organic produce. This project includes exterior renovations for the entire retail center which is anchored by on the north end by Planet Fitness. Four tenant spaces will remain between the two anchor tenants. Construction at the site should be complete in 2017.
Fresh Thyme.PNG

White Stone Station Multi-tenant Retail


A 10,200 square foot 5-tenant building has recently been constructed at the southeast corner of the intersection of Falls Parkway and Pershing Avenue. The building incorporates longboard cladding and architectural elements which complement the larger multi-tenant retail building nearby. The outdoor dining area created as part of the project supports the Firehouse Subs restaurant which opened in early 2017.

White Stone Station Multi Tenant.png

Hilton Home2 Suites Hotel


Construction on a 105 room Hilton Home2 Suites extended stay hotel moved forward in 2016 as part of the White Stone Station mixed-use development area. This hotel chain caters to business travelers and other visitors seeking hotel rooms with amenities like kitchen appliances, fitness facilities and spacious common areas. The hotel is under construction at the southwest corner of the Falls Parkway and Junction Way intersection. 
 

The Junction Apartments


Construction continued in 2016 on 318 market-rate apartments along Junction Way between Pershing Avenue and Falls Parkway in the White Stone Station redevelopment area. Most of these units are now available for rent and the final two apartment buildings will be completed in 2017. Residents benefit from easy access to many shopping and dining options in the White Stone Station area and from close proximity (0.5 miles) to the historic Village Centre
.

Rainbow Child Care Center


A 10,782 square-foot day care center has been approved for the northwest corner of Good Hope Road and Appleton Avenue adjacent to the Woodlands Market commercial area. The Rainbow Child Care Center will include classrooms, a gymnasium and an outdoor play area complete play structures and a splash pad. The facility will operate with 15 full-time employees as the day care center grows to its anticipated capacity of 115 students.

Elizabeth House


Plans have been approved for the development of a 45 unit Community Based Residential Facility (CBRF) at the southeast corner of Good Hope Road and Pilgrim Road in central Menomonee Falls. The 52,400 square foot facility will provide low and intermediate level nursing care and memory care. The approved plans include a second phase 45 unit building to be built as a mirror image of the approved building.

Village Public Works Facility


Plans were approved in 2016 for a 112,650 square foot building and a new salt shed adjacent to the existing Public Works offices and garage along the north side of Good Hope Road to the west of Pilgrim Road. The facility will include indoor parking for Village vehicles and equipment, new reception and office space, six service bays, a wash bay and a new fuel station This modern facility will replace deteriorating buildings which date to the 1950s and ensure that the Public Works Department can provide and maintain Village infrastructure and essential services for years to come. 

Home2Suites.png
Junction Apartments2.png
Rainbow Plan.png
Elizabeth House Rendering.png
Public Works Facility Rendering.jpg

ER Wagner


Construction proceeded in 2016 as a 158,000 square foot building along old Orchard Road in Northeast Menomonee Falls which will serve as the corporate headquarters for ER Wagner Manufacturing. The facility, which is expected to be completed in 2017, will employ approximately 130 full-time staff and will include 135,000 square feet of manufacturing space and 23,000 square feet of office space.


Zilber Speculative Industrial Building


A 180,000 square foot industrial building was recently developed by Zilber Property Group along Manhardt Drive in southeast Menomonee Falls. The building accompanies an existing 146,000 square foot building that was completed in 2015 and will be occupied by up to four tenants.

Aero Park


The Village approved a preliminary plat for 60 single family lots to be developed along the east side of Lannon Road between Silver Spring Drive and Lisbon Road in southwest Menomonee Falls. The lots in the proposed Aero Park subdivision range in size from 18,000 square feet to 28,000 square feet with an average lot size of 19,600 square feet. 

Christman Park


The Village has conditionally approved a final plat for 31 single family lots to be developed at the northeast corner of the intersection of Christman Road and Maple Road in northern Menomonee Falls. The lots in the Christman Park subdivision range in size from 12,000 to 31,600 square feet.
MSI.png
Zilber 2.png
Aero Park.png
Christman Park.png

Fox Meadow


60 single family lots are being developed on the west side of Pilgrim Road between Chateau Drive and Wildflower Drive in Central Menomonee Falls. The lots in the Fox Meadows subdivision range in size from 15,000 to 28,000 square feet with an average lot size of over 17,000 square feet.

Fox View Estates 2.png

Silver Spring Estates


Plans were approved for the third phase of Silver Spring Estates Subdivision which is located to the east of Town Line Road and to the north of Silver Spring Drive in southwest Menomonee Falls. Phase three will add 26 single family lots with lot sizes ranging from 12,375 to over 44,000 square feet. When complete, the Silver Spring Estates Subdivision will create a total of 138 residential parcels (12 duplex and 126 single family lots) across from Hamilton High School on the former Lied’s Nursery site.

Silver Spring Estates Phase 3 Final Plat.png

Victory Subdivision


The Village is reviewing a preliminary plat for 75 single family lots to be developed at the northeast corner of the intersection of Pilgrim Road and Lisbon Road in southeast Menomonee Falls. The lots in the proposed Victory Subdivision range in size from 10,000 square feet to 29,000 square feet with an average lot size of over 13,300 square feet. 

Victory.png

Weyerhaven Subdivision


Construction is proceeding on the second phase of Weyerhaven Subdivision which is located along the east side of Lilly Road and to the south of Mill Road in southeast Menomonee Falls. Phase two adds 40 lots with an average size of 13,700 square feet. When complete, the Weyerhaven Subdivision will create a total of 140 lots.

Wyerhaven Addition 1.png